Rail Infrastructure for Steel Plants

We design, build and maintain the railways that move steel into and out of a plant. A steel mill track carries heavy axle loads and operates alongside cranes, warehouses and unloading yards. That is why our engineering starts with the load, the railcar flow and the switching space.

We have more than 15 years of experience in industrial rail projects in Mexico. We work with steel plants in Nuevo León and Guanajuato.

What We Do for the Steel Industry

We cover the complete track life cycle: design, construction, maintenance and material supply. Each service responds to a specific decision at the plant.

Track Design and Construction

Receiving and shipping tracks, spurs and terminals. Includes earthwork, drainage, turnouts, thermite welding, rail destressing and concrete-embedded tracks.

Operational Safety

We comply with STPS (Mexican Ministry of Labor) regulations and are registered with REPSE. We hold CPKC and Ferromex certification to work on track.

Preventive and Corrective Maintenance

Scheduled inspections so the track never slows down production. We check track geometry, gauge (distance between rails), fastenings and ballast. We also perform ultrasonic rail inspection.

Materials and Railcar Movers

Track material through Rail Depot and railcar movers through Rail Movers. Rails, ties, fastenings and special trackwork with technical specifications. For yard switching, we offer Shuttlewagon railcar movers, for which we are the exclusive representatives in Mexico.

How We Plan a Track for Steel

acero

We plan the track based on the plant’s actual operation. Before designing, we review:

  • Product: coiled steel, plate, rebar or scrap. Each one requires a different type of unloading.
  • Unloading equipment: overhead crane, gantry crane or forklift. It defines the layout of the spurs.
  • Railcar flow: how many railcars come in and go out per day. It defines the length of the receiving and shipping tracks.
  • Railroad connection: the interchange point with the mainline and the permits it requires.

A short receiving track forces the train to be split and requires more switching moves.
We size the tracks so the plant can receive and ship without delays.

The unloading spur is aligned with the crane and the warehouse. A well-designed track reduces railcar movements and risk to personnel.

When production grows, the yard becomes the bottleneck. We develop alternatives to expand capacity without stopping operations.

Steel Industry Projects

11
Design and construction of 700 m of track to expand the yard, increase receiving and shipping capacity and reduce delays. Celaya, Guanajuato.
steel-technologies
Coiled steel and plate transfer terminal with 1.5 km of track. It included one track to the warehouse area and two spurs to the unloading area with a gantry crane. Pesquería, Nuevo León.
metalsa
Construction and expansion of a 250 m rail yard to increase its capacity. Apodaca, Nuevo León.

Plants That Trust Us

Acero-prime
aceros-del-toro
aluminum-dynamics
11
diamond-international
irasa
Fortacero-logotipo2
merexmex
metalsa
serviacero
steel-technologies
suacero
tenaris
ternium
villacero

Let's Talk About Your Plant

Tell us what you produce, how many railcars you move and what problem your track has today. We will propose a technical assessment.