Propark Industrial Park

Diapositiva16

Design and construction of roads for industrial park

Services

Earthworks, drainage, track construction and connection to the main track with AREMA insulated No. 11s gear set, aluminothermic welding, stress relieving.

Construction

The construction project includes an access road and an interior brickyard in an industrial park. The project includes the construction of a support road, an access road and an interior road to the industrial park. Earthworks, drainage and railroad tracks were constructed. The tracks were built with 100 lbs/yd welded rail, RNY concrete sleepers and AREMA 4ª limestone ballast. No. 11 BNSF-UP switch sets were installed on the supporting rail. No. 10 Conrail switch sets were installed for the inner rail and the connection to the industry.

Photo Gallery

Category :

Industrial Parks

Client :

3 Km

Date :

August 27, 2024