Vallon

Diapositiva9

Vallon Logistics Terminal

Services

Design, Permits, Earthworks, Civil Works, Drainage, Track Construction, Switch Set Signaling, No. 10 Connection Hardware inside the property, Aluminum-Thermal Rail Welding, Stress Relief.

Design and Construction

Roadway design for an Automotive Storage Terminal project. Proceedings were completed with SCIT and CPKC. Construction included earthworks, interior culverts, drainage and construction of the railroad tracks. Connections were included on penetration spurs using Arema No. 10 Switch Set. This project was constructed with concrete sleepers with Vossloh fastening, and steel sleepers. Rail 112 RE welded, concrete ballasted track.

Photo Gallery

Video

Category :

Transfer Terminals

Client :

8.5 Km

Date :

August 27, 2024