Puerta del Norte Industrial Park

Project sheet for the Puerta del Norte Industrial Park rail tracks

Escobedo, Nuevo León

Rail Tracks for the Puerta del Norte Industrial Park

We brought the railroad into Puerta del Norte Industrial Park. We handled:

  • Feasibility study and executive design.
  • Permitting with the SCT and KCSM (now CPKC).
  • Construction of track and sidings.
  • Signaled connection switch sets.
  • Aluminothermic welding and stress relieving.
Item Value
Client Puerta del Norte Real Estate
Location Escobedo, N.L.
Track built 3 km
Railroad KCSM (now CPKC)
Type Industrial park

How It Was Built

We started with the feasibility study and the executive design, and handled the connection permitting with the SCT and KCSM. Then we built 3 km of track:

  • Interior tracks that reach the park’s lots.
  • Sidings along the main line: parallel tracks where the train drops off and picks up cars without blocking the line.
  • No. 11 BNSF-UP switch sets in 115RE to connect with the main line, signaled with the J7 system.
  • Concrete ties with RNY elastic fastening, welded 115RE rail and AREMA No. 4 granite ballast.
  • Oak wood ties with classic fastening on curves greater than 4°.

Project Gallery

Does your industrial park need a rail track?

See our other industrial park projects and how we work with the CPKC network. Tell us where the park is located and we’ll propose a feasibility study.

3 km of track were built: interior tracks to the lots, sidings along the main line and signaled No. 11 switch sets to connect the park to the rail network.

We did. We prepared the feasibility study and the executive design, and handled the connection permitting with the SCT and KCSM, the network now operated by CPKC.

Oak wood ties with classic fastening were installed on curves greater than 4°. Concrete ties with elastic fastening were used on the rest of the track.

It is a track parallel to the main line where the train drops off loaded cars and picks up empty ones without blocking the line. It lets the park receive trains without stopping traffic on the main line.

Category :

Industrial Parks

Client :

3.5 Km

Date :

August 27, 2024