
Pesquería, Nuevo León
Rail Tracks for Propark Industrial Park
We built the track network that connects Propark Industrial Park to the railroad. Our scope included:
- Earthworks and drainage.
- Construction of the access track and sidings.
- Connection to the main track with an insulated AREMA No. 11 turnout.
- Aluminothermic welding and stress relief.
| Item | Details |
|---|---|
| Client | Propark Industrial Park |
| Location | Pesquería, N.L. |
| Type | Industrial park |
How It Was Built
The park receives trains on three tracks, each with a different function:
- Support siding: a track parallel to the main line where the train sets out and picks up cars. It connects with BNSF-UP No. 11 turnouts.
- Access track: a track that enters the park from the siding.
- Interior siding: a track inside the park used to sort cars before delivering them to each industry. It connects with Conrail No. 10 turnouts, as does the industry spur.
The tracks were built with 100 lb/yd welded rail, concrete ties with RNY fastening and AREMA No. 4 limestone ballast, on new earthworks and drainage.
The Vallon Logistics terminal, which we also designed and built, operates within the Propark complex.
Project Gallery
Does your industrial park need a rail track?
See our other industrial park projects. Tell us where the park is located and we will propose a feasibility study.
Frequently Asked Questions
It has a support siding next to the main track, an access track that enters the park and an interior siding that sorts cars before delivering them to each industry.
It allows a group of cars to be received inside the park and distributed to each industry without occupying the entry track. This way the train delivers and leaves quickly, and internal switching is done afterward.
100 lb/yd welded rail, concrete ties with RNY fastening and AREMA No. 4 limestone ballast. The connections use BNSF-UP No. 11 turnouts on the support siding and Conrail No. 10 turnouts inside the park.
The Vallon Logistics terminal, which we also designed and built, operates within the Propark complex.



