BMW San Luis Potosí

BMW Rail Spur project sheet: automotive rail terminal in San Luis Potosí

Rail spur and automotive yard in San Luis Potosí

Automotive rail terminal for BMW

We designed and built the rail terminal where BMW loads the vehicles that leave its plant in San Luis Potosí. We handled:

  • Design, engineering, executive project and permits.
  • Construction of track and switches.
  • Signalized at-grade crossing.
  • Aluminothermic welding and stress relief.
  • Terminal maintenance.
Detail Value
Client BMW
Location San Luis Potosí, S.L.P.
Year 2019
Track built 4 km
Capacity 100 Automax cars
Sector Automotive

How the terminal was built

The terminal receives 100 Automax cars. An Automax is an enclosed multilevel auto rack car. The yard has four 900 m track fans; a track fan is a group of parallel tracks that branch off the same track.

  • 4 km of track with three insulated No. 9 BNSF-UP switches.
  • 2.6 km of ballasted track with concrete ties, elastic fastening and welded 115RE rail.
  • 1.4 km of track embedded in concrete on the pads, with Narstco M8 steel ties and RailSeal sealing.
  • Concrete pads: slabs next to the track where the ramps for loading the vehicles are placed.
  • Earthwork, drainage and lighting, a signalized at-grade crossing and asphalt roads for new vehicles and maintenance.

Construction gallery

Video

Does your plant need an automotive terminal?

See our other automotive sector projects and our rail tracks for the automotive industry. Tell us how many vehicles you ship and we will propose a technical assessment.

It receives 100 Automax cars in a yard with four 900 m track fans. It has 4 km of track with three insulated No. 9 switches and concrete pads for loading the vehicles with ramps.

The ballasted track (2.6 km) is used to move and store railcars. On the loading pads the track is embedded in concrete (1.4 km), with steel ties, so that vehicles and ramps move on a flat surface.

It included design, engineering, executive project and permits, earthwork, drainage, lighting, a signalized at-grade crossing and asphalt roads to move the new vehicles and carry out maintenance.

The project scope included maintenance.

Category :

Automotive Sector

Client :

4 Km

Date :

August 27, 2024