Design, Permits, Earthworks, Civil Works, Drainage, Track Construction, Switch Set Signaling, No 20 and 15 BNSF Connection Fittings to Main Track, Aluminum Thermal Rail Welding, Stress Relief.

Design and Construction

Track design for a Gas Discharge project that includes a 2 km. long bareroad. The procedures were carried out before SCIT and CPKC. Construction included earthworks, culverts in the right of way and interior, drainage and construction of the railroad tracks. Connections were included on the right-of-way with Switching Sets No. 20 and No. 15 BNSF. This project was constructed with concrete sleepers with RNY fastening, and steel sleepers. Welded 115 RE rail, concrete ballasted track and concrete stifled track in the transfer zone.

Photo Gallery

Video

Category :

Enlargements

Client :

5.3 KM

Date :

August 27, 2024